Sterling Slicer Model 95

Sterling Model 95: The Mechanical Masterpiece by Josiah Anstice & Co.

A rare piece of early 20th-century American engineering, the Sterling Model 95 slicer represents a milestone in the world of vintage slicer collecting. Manufactured in Rochester (New York, USA) by the historic firm Josiah Anstice & Co. Incorporated, this machine combines avant-garde industrial design with a fascinating and unusual mechanical system.

Sterling Model 95: The Mechanical Masterpiece by Josiah Anstice & Co.

A rare piece of early 20th-century American engineering, the Sterling Model 95 slicer represents a milestone in the world of vintage slicer collecting. Manufactured in Rochester (New York, USA) by the historic firm Josiah Anstice & Co. Incorporated, this machine combines avant-garde industrial design with a fascinating and unusual mechanical system.

Technical Features and Historical Peculiarities

  • Original Intended Use: Originally conceived as a meat slicer, the Sterling 95 is designed to offer a larger cutting thickness compared to classic deli slicers. It features a micrometric thickness adjustment system with 15 different positions.

  • Historical Patents (1908): The patents filed on June 30 and August 25, 1908, bear witness to the absolute brilliance of its design. The heart of the innovation lies in its kinematic motion: the blade does not merely spin, but rotates parallelly while rocking (or "swinging") at the back of the flywheel.

  • Ergonomics and Architecture:

    • The meat-gripper plate is positioned at the rear of the flywheel, following the path of the rocking motion.

    • The slice thickness regulator is elegantly placed on the upper-left side of the machine's body, easily accessible to the operator.

Why is it a must-have for collectors?

The Sterling Model 95 is considered one of the most scenographic and choreographic slicers ever built. Its unusual, almost hypnotic motion, combined with the rarity of the brand and its beautiful cast-iron lines, makes it a true vintage kinetic sculpture, highly coveted in high-end international collecting circles.