Berkel Model 1

The Berkel Model 1 flywheel slicer was manufactured between 1915 and 1924 at the primary Berkel factories in Rotterdam, Holland. In later years, production was expanded to Argentina by S.A. van Berkel Sudamericana to satisfy growing demand across the Americas.

Berkel Europe Model 1 Slicer: History, Specs & Restoration

The Berkel Model 1 flywheel slicer was manufactured between 1915 and 1924 at the primary Berkel factories in Rotterdam, Holland. In later years, production was expanded to Argentina by S.A. van Berkel Sudamericana to satisfy growing demand across the Americas.

This iconic early-20th-century model incorporates mechanical elements from its predecessors, including the sharpener design originally introduced on the Berkel Model L, combined with a 350 mm diameter blade.

Key Features & Regional Branding

  • Floral Flywheel: Operated via a 399 mm external diameter floral flywheel embossed with the text "van Berkel's Patent Rotterdam Holland".

  • Authentic Labeling: Depending on the destination market, official metal rating plates were applied—oval or round badges on the machine body opposite the flywheel, and a round emblem on the lower shoulder area.

  • Slice Thickness Regulator: Features a precise 16-position slice thickness adjustment, located on the upper-right section of the carriage.

  • Original Finishes: Produced in classic Red, Black, and Ivory color options, paired with nickel-plated metal components.

  • Mounting & Pedestal: Originally intended for placement directly on butcher counters, but available with an optional original Berkel stand upon request.

Technical Specifications & Dimensions

  • Production Period: 1915 – 1924

  • Manufacturing Origins: Rotterdam (Holland) & Buenos Aires (Argentina)

  • Blade Diameter: 350 mm

  • Flywheel Diameter: 399 mm (Floral design)

  • Slice Adjustment Positions: 16 settings

  • Metal Plating: Nickel-plated components

  • Net Weight: 94 kg

Dimensions & Footprint

  • Overall Dimensions: 840 mm (L) x 630 mm (W) x 560 mm (H)

  • Base Footprint: 250 mm (Front) x 300 mm (Rear) x 460 mm (Length)

Expert Restoration Process by "The World's Best Slicers"

Every Berkel Model 1 restored in the laboratories of The World's Best Slicers follows an uncompromising, museum-grade conservation methodology:

1. Mechanical Conservation & Zero-Replacement Policy

  • Conservation First: Worn or damaged components are repaired rather than replaced whenever possible.

  • Precision Engineering: Parts undergo material resurfacing via specialized welding, followed by custom turning and milling to return components to exact original factory dimensions.

  • Authentic Spare Parts: Missing components are replaced exclusively with period-correct original spare parts sourced from historical facilities or donor machines.

2. Paint & Aesthetic Restoration

  • Cryo-Stripping: Non-abrasive cryogenic paint removal strips old finishes while protecting the integrity of the underlying cast iron structure.

  • Eco-Compliant Paints: Repainted with modern, environmentally safe coatings reformulated to match historical color shades.

  • Authentic Copal Decals: Artwork and branding are applied using traditional copal paint decals. We strictly avoid stickers, airbrushing, or modern fantasy artwork.

Authenticity & Guarantee

Every restored Berkel Model 1 is delivered complete with an Official Certificate of Originality and Guarantee, certifying its historical accuracy and mechanical integrity.